What goes into a day once the frame exists?
The frame tells you how many days you have and where you sleep each night. The day itself holds three kinds of thing: points with a fixed time, moves between places, and open time. Each kind needs its own check, so list them separately before you put them in order. A day written as one undifferentiated list tends to hide the single item that cannot move.
Why does a timed entry go in first?
A timed entry is a fixed point. Arriving before or after the slot does not guarantee that you get in, and depending on capacity you may be pushed to a later slot. Treat the slot as the anchor of its day, and count the arrival margin the venue asks for as part of that day.
What happens if you miss a timed slot?
Assume the slot is gone and decide what the day becomes. Do not build the day around a later slot you have not been offered. Keep one item that can move to another day, so a missed slot shifts something small rather than the whole day.
How do you set a ride on the day line?
Write each ride as its own line with the departure time you will use, and not a hoped-for hour. A travel-time estimate is built from traffic and transit conditions for the planned travel time, so the same route can produce a different figure at another hour. When you change the departure time, check the estimate again.
An estimate is a prediction and can be wrong, so allow room for it. Use the figure as the centre of the allowance, then add room for what the estimate cannot see, such as a stop for water, a queue at a gate, or a wrong turn.
Travellers heading on to Bali tend to ask how long the ride from the airport to their first base will take. Check that leg at the hour you will travel, using the same method as any other ride: how transfers run once you land.
How do you plan a ferry or other weather-exposed leg?
Weather can cancel a ferry sailing, so a ferry leg needs a fallback written on the day line, not only a departure time. Decide before you commit what you will do if the sailing does not run: take the next one, move the rest of the day, or switch route. Write that fallback beside the leg, so it is read at the same moment as the time.
A sea-conditions forecast describes likely conditions. It does not confirm a cancellation, and only the operator’s own notice does that. Check it on the day, and treat any fallback that needs a booking as not in place until the booking is made.
Which checks belong to each kind of block?
Each kind of block needs different information on the line and a different response when it slips.
| Block | What to write on the day line | What to do if it slips |
|---|---|---|
| Timed entry | Slot time, the arrival margin the venue asks for, and the ride that reaches it | Use a later slot only if one has been offered; otherwise move the item that can move |
| Ride between places | Departure time you will use, the estimate, and a margin | Leave earlier, or drop the smallest item after the ride |
| Ferry or other weather-exposed leg | Sailing time, the operator’s notice to check on the day, and the fallback | Use the fallback you wrote before the day |
| Open block | Start and end time, and what it is kept for | Absorb the slip here first |
How do you check a finished day?
Read the day line from the top and mark each fixed point. Then ask three questions. Does every fixed point have its margin? Does every ride have a departure time and an allowance? Does every leg that can be disrupted have a fallback beside it? A day that passes all three can still feel full. The real test is whether a slip has somewhere to go.
Then count the open blocks. A day with none has nowhere to put a slip, so the slip tends to move into the first booking of the next day. The limit on how many items a day can hold is set on the pacing page.
In what order should you fill a multi-day plan?
Start with the days that hold the most fixed points, then work toward the days with the fewest. Days with a timed entry or a ferry leg are hard to change once other days are set, so they shape the rest of the plan. Filling the easy days first leaves the constrained ones to fit whatever space is left.
What to settle once every day is full
When each day has its fixed points, margins and fallbacks, the next question is how much to put in each one, and the pacing page sets that limit. When a leg does slip, the delays page shows which commitment to protect and where the slack should sit. The frame these days sit inside comes first, on the trip skeleton page.